A spatial plan may expressly exclude developments in undeveloped areas by means of a residual clause

In its judgment of 25 November 2026, Case No. 6 As 197/2026-57, the Supreme Administrative Court dismissed an appeal on points of law brought by the developer of the Slaný solar park and upheld the annulment of its joint development permit. The Court considered whether a spatial plan may expressly preclude the siting of a development in an undeveloped area within the meaning of Section 18(5) of the Building Act where it defines impermissible uses by means of a so-called residual clause.

The Ministry of Industry and Trade upheld the permit for a 31 MW photovoltaic power plant on arable land. The spatial plan of the town of Slaný conditionally permitted only essential technical and transport infrastructure in the areas concerned. It classified any use other than the principal, permissible and conditionally permissible uses as impermissible. Both the Ministry and the competent authorities relied on guidance issued by the Ministry of Regional Development, according to which a residual clause does not constitute an express exclusion. The Regional Court in Ostrava annulled the decision.

The Supreme Administrative Court confirmed that a residual clause constitutes an express exclusion. Under Section 18(5), a municipality may restrict the range of developments that may be sited in undeveloped areas. It must do so expressly and on grounds of public interest. However, it is sufficient for the spatial plan to demonstrate the municipality’s clear, unequivocal and unambiguous intention to exclude certain developments. This intention may be expressed by listing specific developments, defining their type or purpose in more general terms, or using a residual clause. The Court followed its earlier judgments in Cases Nos. 3 As 77/2023-37 and 1 As 398/2020-31. The judgment in Case No. 4 As 234/2017-38, relied upon by the appellant, concerned a differently worded spatial plan in which the residual clause applied only to activities.

The Court did not consider it decisive that the development was classified as being in the public interest under the Energy Act. Section 18(5) does not distinguish between such developments and other developments. A spatial plan is therefore not required to list the specific developments in the public interest that it excludes.

As regards the statement of reasons accompanying the spatial plan, the Court held that the adequacy of those reasons was a matter concerning the lawfulness of the plan. Administrative courts may examine this issue only in proceedings for the annulment of a measure of a general nature under Section 101a of the Code of Administrative Justice. In development permitting proceedings and subsequent judicial review proceedings, in the absence of an application for such annulment, the spatial plan enjoys a presumption of validity. The Court therefore did not assess whether the municipality had legitimately excluded a competing public interest by means of the residual clause.

The Court also rejected the interpretation set out in the explanatory memorandum to Section 122(3) of the new Building Act, according to which a residual clause does not constitute an express exclusion. In the Court’s view, this interpretation is inconsistent with both the established case law and the purpose of the legislation. The guidance issued by the Ministry of Regional Development is not binding on the courts and is contrary to the established case law. The Court did not refer the case to the Enlarged Chamber.

The judgment of the Supreme Administrative Court of 25 November 2026, Case No. 6 As 197/2026-57, is available here (in Czech).